summaryrefslogtreecommitdiff
path: root/svx/source/svdraw
diff options
context:
space:
mode:
authorEike Rathke <erack@redhat.com>2013-05-17 14:04:34 +0200
committerFridrich Strba <fridrich@documentfoundation.org>2013-05-17 14:27:23 +0000
commit0b183466bcdf56c9221ab28be9c52ed8787fe4ea (patch)
treeeb3f06939d0a80d2a75f3b8584b0c60add782abb /svx/source/svdraw
parent1e489d411a40c6b98966917c3849c8bcc110de34 (diff)
resolved fdo#63805 max day of month of the intended month
Since 6619955e72c1c2f29a32e82478d19147c0d7610a Date::GetDaysInMonth() operates on the normalized value that corresponds to the actual values set at the Date instance, obtain and set number of days for the intended month instead of using the rolled-over date. (cherry picked from commit cd9d1bdf5e3351c929d5b651c009ee17b4d962c4) Conflicts: sc/source/core/data/table4.cxx Change-Id: Ia6b007675104f8e134b278f216c3bb48b72f061c Reviewed-on: https://gerrit.libreoffice.org/3938 Reviewed-by: Fridrich Strba <fridrich@documentfoundation.org> Tested-by: Fridrich Strba <fridrich@documentfoundation.org>
Diffstat (limited to 'svx/source/svdraw')
0 files changed, 0 insertions, 0 deletions