summaryrefslogtreecommitdiff
path: root/icon-themes/colibre/cmd/lc_zoompanning.png
diff options
context:
space:
mode:
authorJustin Luth <justin.luth@collabora.com>2026-04-04 09:26:33 -0400
committerJustin Luth <justin.luth@collabora.com>2026-04-07 01:04:13 +0200
commiteb4c2bf13774d3232a445a9313298dbe0013c26e (patch)
tree5d35c3b7b8f705bfba1cdb11b1ffe54ef7660494 /icon-themes/colibre/cmd/lc_zoompanning.png
parentc062f78f128a521c1f7d80224a336e943bf28cb2 (diff)
tdf#170215 chart import: finish calculation-settings before chart:chartHEADmaster
This fixes a longstanding problem exposed by 25.8.0 commit 33f644074e498336d97a881be903662c9a6abedf OOXML handling of 1904 null date for charts with internal data provider The problem was that size attributes for chart:chart were being collected before table:calculation-settings was written out. So the size was lost during import because it was written into table:calculation-settings instead of chart:chart make CppunitTest_chart2_export3 CPPUNIT_TEST_NAME=testTdf170215_nullDate Change-Id: Ie28cfb09945734fac7a49e8eef52831d933b430a Reviewed-on: https://gerrit.libreoffice.org/c/core/+/203220 Reviewed-by: Justin Luth <jluth@mail.com> Tested-by: Jenkins
Diffstat (limited to 'icon-themes/colibre/cmd/lc_zoompanning.png')
0 files changed, 0 insertions, 0 deletions